If your landlord, centre management, or power company notifies you of a scheduled power event or after-hours shutdown, follow the steps below to safely power down equipment.
Do not isolate power at the wall or switchboard while equipment is running.
Instead, power down in the following order:
Do not unplug network equipment unless specifically instructed.
If a UPS is installed, leave devices connected to it.
Power equipment back on in the following order:
SPTV and DSP PRO typically boot within 1 minute once powered.
This typically indicates a power interruption occurred overnight.
Complete the following checks in order:
• UPS units protect equipment but may fully discharge during prolonged outages.
• If UPS batteries are drained, equipment may not automatically restart.
• Always confirm the source device (SPTV) is powered on before assuming AV hardware failure.
• Technician dispatch requires fault validation and is chargeable.
• Ensure studio staff know how to confirm the SPTV player is powered on.
• If notified of planned power works, allow time before first class to confirm all equipment has restarted correctly.